{"domain":"threephasecost.co.uk","name":"Three Phase Cost","url":"https://inite.ai/en/atlas/threephasecost.co.uk","site":"https://threephasecost.co.uk","summary":"Matches property owners needing a three phase electricity supply upgrade with electrical contractors who quote the connection work.","forWhom":"Property owners in Great Britain needing a three phase supply upgrade for EV chargers or heat pumps","useCases":["request quotes from electricians for a supply upgrade","check the current supply type on the main fuse","describe the property and load for contractor pricing"],"categories":["commerce"],"pricing":null,"priceMoves":[],"interfaces":{"readOn":"2026-10-26","apiDocs":null,"openapi":{"url":"https://threephasecost.co.uk/openapi.json","paths":4,"title":"Three Phase Cost API"},"mcp":[{"name":"uk.co.threephasecost/site","tie":"namespace","registered":true,"remotes":["https://threephasecost.co.uk/mcp"],"packages":[],"probe":{"state":"open","checkedOn":"2026-10-26","toolCount":3,"tools":["enquiry_describe","enquiry_fields","submit_enquiry"],"serverName":"Three Phase Cost (threephasecost.co.uk)"}}],"mcpServerCard":null,"status":null},"mcpMeasured":{"server":"https://threephasecost.co.uk/mcp","checkedSince":"2026-10-26","dailyChecks":9,"uptimePercent":100,"medianMs":1055,"signIn":"none","clientRegistration":null,"tools":3,"contextTokens":602,"definitionsGrade":"B","definitionsScore":83,"typedResults":0,"failingChecks":{"annotations":3},"warnings":{},"coverage":{"share":0.5,"cases":[{"useCase":"request quotes from electricians for a supply upgrade","verdict":"covered","firstTool":null,"checks":null},{"useCase":"check the current supply type on the main fuse","verdict":"not_covered","firstTool":null,"checks":null},{"useCase":"describe the property and load for contractor pricing","verdict":"unsure","firstTool":null,"checks":null}]},"adoption":{"npmWeekly":null,"pypiWeekly":null,"githubStars":null},"score":{"value":82,"parts":{"reliability":99,"coverage":50,"definitions":83,"context":100,"connect":100},"penalties":[]},"advice":{"verdict":"with_care","why":["its tools do \"request quotes from electricians for a supply upgrade\", but not \"check the current supply type on the main fuse\""],"how":[]},"method":"https://inite.ai/en/atlas/mcp/report"},"connect":{"order":["mcp","openapi","llmsTxt"],"mcp":[{"name":"uk.co.threephasecost/site","url":"https://threephasecost.co.uk/mcp","answers":"open","checkedOn":"2026-10-26","weakTie":false,"registry":"https://registry.modelcontextprotocol.io/v0/servers?search=uk.co.threephasecost%2Fsite","config":{"mcpServers":{"threephasecost":{"url":"https://threephasecost.co.uk/mcp"}}},"install":{"transport":"http","claudeCode":"claude mcp add --transport http threephasecost https://threephasecost.co.uk/mcp","cursor":"cursor://anysphere.cursor-deeplink/mcp/install?name=threephasecost&config=eyJ1cmwiOiJodHRwczovL3RocmVlcGhhc2Vjb3N0LmNvLnVrL21jcCJ9","vscode":"vscode:mcp/install?%7B%22name%22%3A%22threephasecost%22%2C%22type%22%3A%22http%22%2C%22url%22%3A%22https%3A%2F%2Fthreephasecost.co.uk%2Fmcp%22%7D","connector":{"url":"https://threephasecost.co.uk/mcp","note":"Add it as a custom connector in the client’s settings; the client opens the sign-in itself when the server asks for one."}}}],"openapi":{"url":"https://threephasecost.co.uk/openapi.json","paths":4},"apiDocs":null,"llmsTxt":"https://threephasecost.co.uk/llms.txt","status":null,"readOn":"2026-10-26"},"trust":{"readOn":"2026-10-26","certifications":[],"training":null},"used":0,"alive":100,"traits":{"buyer":"consumer","deployment":"saas-only","developerFocus":false,"readAt":"2026-10-27"},"verifiedPlans":null,"fromVendor":null}