
NOVTRIQ MCP server
Which MCP servers are NOVTRIQ's own, from the official registry and from asking its own domain, whether they answer, and what they offer. A program checked each of these, nobody copied them from a product page.
read 2026-10-26
- Registry nametech.novtriq/engineeringverified in the MCP registry
The registry name sits under novtriq.tech. The registry only lets a publisher use that namespace after proving control of the domain through DNS or HTTP.
- Stateanswerschecked 2026-10-26
- Tools27
- Server calls itselfnovtriq-engineering
- Server version3.0.0
- Protocol version2025-06-18
On 2026-10-26 the server answered initialize and tools/list without a sign-in. First answer in 623 ms.
- Its tools do every use case we checked: Check building energy compliance against EPBD; Screen cybersecurity gaps against NIS2 requirements.
Once connected
- For "Check building energy compliance against EPBD", the likely first call is assess_epbd_score.
- For "Screen cybersecurity gaps against NIS2 requirements", the likely first call is check_nis2_readiness.
- Parameters are untyped or undescribed in 19 of 27 tools: check arguments before calling.
Said by rules from the measurements above. The likely first call is a model's pick from the tool list; read its description before relying on it.
- INITE MCP score92 of 100answers 100 · does the job 100 · definitions 72 · context 81 · connects 100
- What an agent can do with it2 of 2 use cases
- Answered100% of days9 of 9 daily checks
- Median first answer561 ms
- Space in an agent's context≈ 5,950 tokensthe definitions of all its tools (27), which an agent carries on every turn
- Tool definitionsC · 72 of 100
- Typed results0 of 27 toolsdeclared outputSchema: results come typed, read once
- Parameters without a description: in 19 of 27
- Not saying whether it only reads or can destroy: 27 of 27
What an agent can do with it
- can do · Check building energy compliance against EPBD
- not sure · Calculate data centre PUE to IEC 30134-2
- can do · Screen cybersecurity gaps against NIS2 requirements
Each of the product's use cases, put to Jev against this server's tool list: can an agent do it with these tools?
Worth a look
None of the five warning signs in these definitions.
A program checks the server once a day: initialize and tools/list, no model. Tokens are the definitions' length at about four characters a token. The grade averages six checks of every tool's name, description, schema and annotations; it says how well the tools are described, not whether they work. The score weighs what was measured and nothing else: answering (25%), doing the product's job (25%), definitions (20%), context (10%), use (10%) and how readily a client connects (10%). A part that was not measured is left out, and a hidden instruction caps the score at 40. The state of vendors' MCP servers: method and numbers →
calculate_pueCalculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.
check_nis2_readinessAssess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions.
assess_epbd_scoreAssess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures.
estimate_cooling_loadEstimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy.
check_uae_bim_complianceCheck UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist.
check_uae_cybersecurityAssess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls.
check_grid_feasibility_uaeAssess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps.
get_technical_dd_quoteGenerate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA.
calculate_carbonCalculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback.
thermal_loadThermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison.
roi_calculatorEngineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict.
building_carbon_footprintBuilding carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions.
building_readinessBuilding Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations.
eurocode_beam_designerPreliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design.
eurocode_column_checkerEurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design.
eu_cost_benchmarkingParametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against…
dgnb_bim_readinessDGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit.
contractor_vettingNIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal…
digital_renovation_passportEPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative.
uk_planning_checkerUK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building…
part_s_evUK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power…
part_o_overheatingUK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE…
mees_checkerEngland & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory…
heatpump_heatlossDomestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative…
eed_datacentre_packEU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation…
uae_climate_ghgUAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry…
sap_sbem_precheckUK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a…
How to connect
Add the server to your MCP client config. Claude Desktop, Cursor and most other clients read this shape:
{
"mcpServers": {
"engineering": {
"type": "http",
"url": "https://api.novtriq.tech/mcp"
}
}
}Add it
Claude Code, in a terminal
claude mcp add --transport http novtriq https://api.novtriq.tech/mcpclaude.ai, ChatGPT and other clients: add https://api.novtriq.tech/mcp as a custom connector in the settings.
Each line is something a program found when it went looking: the registry entry, the server's own answer, a spec that parses. A missing line means we did not find it, not that it does not exist.
Before we count this visit
Analytics and ad measurement tell us which pages and which of our ads do their job: Google Analytics and Google Ads, the Meta pixel, Yandex Metrica, and one first-party id of our own. Nothing is stored until you answer, and declining changes nothing about the site.